Where are RAM 1500 Trucks Made?
Already an established leader of the full-size half-ton pickup segment, the legendary Ram 1500 is synonymous with work-ready performance and impeccable quality. With its reputation for durability and capability stretching back well over half a century, it’s easy to see why the Ram 1500 remains a smash hit to this very day. This icon of American pickup trucks has a rich history of domestic production that also lives on with the current fifth-generation model.
Have you ever wondered where the Ram 1500 is built? How about what plant is responsible for building one of America’s favorite pickup trucks? Our team at Sarchione Chrysler Dodge Jeep Ram has the answers you’ve been looking for! You’ll discover where the Ram 1500 is made and learn more about the assembly plant where it’s built! Let’s take a closer look.
Ram 1500 Assembly Location
It’s only natural that America’s favorite half-ton pickup is also built right here in the USA. Every fifth-generation Ram 1500 is assembled with pride at Sterling Heights Assembly located in Sterling Heights, Michigan. Ram 1500 (Quad Cab and Crew Cab) models are proudly built by UAW Local 1700, 889, and 412. Additionally, Stellantis announced that it would invest $235.5 million in the plant to build the battery electric Ram 1500 REV along with the range-extended Ram 1500 Ramcharger. The future has never been brighter for the Made-in-USA Ram 1500 lineup of pickup trucks!
About Sterling Heights Assembly
Address: 38111 Van Dyke, Sterling Heights, Michigan, United States
Acreage: 286 acres
Plant History:
Originally opened in 1953 as an assembly plant building jet engines, this facility was initially operated by the United States Army as its Michigan Ordinance Missile Plant. Chrysler served as the contractor while building Jupiter and Redstone missiles. In 1980, the plant was converted for automotive purposes by Volkswagen and later bought by Chrysler Corporation a few years later in 1983.
Chrysler LeBaron GTS and Dodge Lancer models began assembly here in September 1984 with Dodge Shadow and Plymouth Sundance production arriving shortly after in 1985. The Dodge Daytona was also built here starting in 1991. A significant milestone was also achieved in 1991 with the plant rolling out its 1.3-millionth vehicle. In the fall of 2000, the Dodge Stratus sedan, Chrysler Sebring sedan, and the Chrysler Sebring convertible began to be built. In the subsequent decade, the Chrysler 200, Chrysler 200 convertible, and Dodge Avenger would also be assembled here.
In 2016, FCA announced that it would invest $1.48 billion in the plant for retooling to build the next generation Ram 1500 and support the future growth of the Ram brand. This announcement also resulted in 700 new jobs to support the production of the new truck.
Sterling Heights Assembly Awards & Milestones
- July 2010 - Second shift of production added, creating about 911 jobs.
- October 2010 - $850 million investment in a state-of-the-art 425,000-square-foot paint shop at the plant as well as surrounding stamping plants.
- October 2011 - $165 million investment to add a 1-million-square-foot body shop.
- July 2015 - LEED (Leadership in Energy and Environmental Design) Gold Green Building System certification
- January 2021 - Plant transitioned from a 3-2-120 operating pattern to a traditional three-shift operation.